Article In: scopus, orcid, cienciavitae
Mooring System Transport and Installation Logistics for a Floating Offshore Wind Farm in Lannion, France
Journal of Marine Science and Engineering
— 2022 — MDPI
Key information
Authors:
Published in
October 1, 2022
Abstract
This work addresses the procedures for the installation of the mooring systems that support the floating offshore wind turbines in a wind farm. It considers the logistics of the installation process and discusses the important role of the weather windows in the planning of those operations at a preliminary stage of the project. The case study is based on a wind farm array of 47 Telwind floating wind turbine platforms, to be located in Lannion (France), with a potential of 470 MW. The study includes the transport and logistics requirements of different mooring components such as chains, connectors and drag anchors.; the description of the installation operations considering the typology of vessels that are necessary in these maneuvers; as well as the planning and costs associated with the transport and installation.
Publication details
Authors in the community:
Shan Wang
ist170910
Carlos Guedes Soares
ist11869
Publication version
VoR - Version of Record
Publisher
MDPI
Link to the publisher's version
https://www.mdpi.com/2077-1312/10/10/1354
Title of the publication container
Journal of Marine Science and Engineering
First page or article number
1354
Volume
10
Issue
10
Fields of Science and Technology (FOS)
other-engineering-and-technologies - Other engineering and technologies
Keywords
- Floating Offshore Wind Turbine
- Mooring
- Installation
- Transport
- Operation
- Hook up
- Weather Window
Publication language (ISO code)
eng - English
Alternative identifier (URI)
http://dx.doi.org/10.3390/jmse10101354
Rights type:
Open access
Financing entity
Fundação para a Ciência e a Tecnologia
Identifier for the funding entity: UIDB-UIDP-00134-2020
Type of identifier of the funding entity: Crossref Funder