Master's Thesis
Soluções de Escavação e Contenção Periférica na K-Tower, em Lisboa
— 2021
Key information
Authors:
Supervisors:
Published in
February 26, 2021
Abstract
In a scene of rapid growing population, together with its migration towards the urban areas, the geotechnical project importance is emerging as a way to optimize the sparse space still available in the urban core. Facing a fast squared meter price rise, and under the light of sustainability and resilience, the geotechnical project complexity was substantially increased by the high number of conditioning factors and the rising demand for underground space. In this context, the present work squires the geotechnical project for the K-Tower, office building to be, located in Lisbon, which faces the Lisbon Metro tunnel. For this contract, a spaced pile wall solution was carried out with temporary ground anchors and corner struts as bracing elements. Therefore, the critical section was modelled by means of a finite element software, Plaxis 2D in order to analyze the performance of the chosen solution. Hence, by comparing values collected at the site through instrumentation with the numerical model output ones, a back-analysis was carried out in order to reduce the gap between the numerical and the monitoring values. Finally, after ensuring serviceability and ultimate limit states, a similar but more economical solution was studied and proposed. This solution promotes a wider spaced pile wall optimizing the steel rebars per pile when compared to the original designed solution. This solution attempts to maintain the structural performance while optimising costs, deadlines, material and environmental impact.
Publication details
Authors in the community:
Supervisors of this institution:
Alexandre da Luz Pinto
ist14423
Fields of Science and Technology (FOS)
civil-engineering - Civil engineering
Publication language (ISO code)
por - Portuguese
Rights type:
Embargo lifted
Date available:
December 16, 2021
Institution name
Instituto Superior Técnico