Master's Thesis
Design of a Structure for Big-sized Appliances in a Warehouse The Case Study of Worten
— 2022
Key information
Authors:
Supervisors:
Published in
July 1, 2022
Abstract
Nowadays, the retail sector faces daily challenges and constant change. In order to keep up with market growth and be a top competitor, it is sometimes necessary to stay one step ahead in terms of competitive advantage. One of the vital points in a supply network is the warehouses, which are responsible for receiving, picking, storing, preparing, and sending the desired products in the right measures, respecting the commitment service levels. Storage needs have increased. It is therefore vital to redesign the layout of certain critical areas in order to be able to store larger volumes in the most efficient manner, while also making the operation capable. The present Master’s Thesis in Industrial Engineering and Management aims to study and provide a design solution for the improvement of a storage area intended for big- sized appliances at Worten. The design should aim to be as efficient as possible, achieving the best compromise between storage and the respective investment. To achieve this goals, constant and daily visits were made to the company’s operation, along with suppliers capable of bringing the idealized structure to life, managing to satisfy all Worten needs. A tool was then designed, consisting of a space warehouse simulator, which will serve as support for the effective operation of the suggested structure.
Publication details
Authors in the community:
Maria Beatriz Inácio Costa Semião
ist182458
Supervisors of this institution:
Susana Isabel Carvalho Relvas
ist46455
Fields of Science and Technology (FOS)
other-engineering-and-technologies - Other engineering and technologies
Publication language (ISO code)
eng - English
Rights type:
Embargo lifted
Date available:
April 22, 2023
Institution name
Instituto Superior Técnico