Dissertação de Mestrado
A Genetic Algorithm for the Flexible Resource-Constraine Multi-Project Scheduling Problem
— 2022
Informações chave
Autores:
Orientadores:
Publicado em
6 de dezembro de 2022
Resumo
The production planning problem for an engineer-to-order company is addressed. This problem was modeled as a flexible resource-constrained multi-project scheduling problem (FRCMPSP). The FRCMPSP is an optimization problem in the field of project management. It consists of scheduling activities of variable duration to minimize the weighted-earliness-tardiness of several projects. Real-world-based problem instances are solved to find feasible schedules and resource profiles that simultaneously fulfill the constraints of all projects in an aggregated environment. In this work, a hybrid metaheuristic approach for the FRCMPSP is developed and evaluated. It contains a problem-adapted schedule generation scheme, which is embedded into a genetic algorithm (GA). Variations within the GA were analyzed, namely through priority rules and adaptation of operators. The performance of the proposed methods is demonstrated in a computational study with benchmark methods from the literature. It achieved feasible solutions for most of the benchmark test instances (62.5%) considering a diverse subset. The impact of flexibility of resource and due date parameters was evaluated, and resource availability had the largest influence on the objective function.
Detalhes da publicação
Autores da comunidade :
José Manuel Leitão da Silva Santos
ist190663
Orientadores desta instituição:
Tânia Rodrigues Pereira Ramos
ist46496
Domínio Científico (FOS)
other-engineering-and-technologies - Outras Ciências da Engenharia e Tecnologias
Idioma da publicação (código ISO)
eng - Inglês
Acesso à publicação:
Embargo levantado
Data do fim do embargo:
19 de outubro de 2023
Nome da instituição
Instituto Superior Técnico