The production planning problem for an engineer-to-order company is addressed. This problem was modeled as a flexible resource-constrained multi-project scheduling problem (FRCMPSP). The FRCMPSP is an optimization problem in the field of project management. It consists of scheduling activities of variable duration to minimize the weighted-earliness-tardiness of several projects. Real-world-based problem instances are solved to find feasible schedules and resource profiles that simultaneously fulfill the constraints of all projects in an aggregated environment. In this work, a hybrid metaheuristic approach for the FRCMPSP is developed and evaluated. It contains a problem-adapted schedule generation scheme, which is embedded into a genetic algorithm (GA). Variations within the GA were analyzed, namely through priority rules and adaptation of operators. The performance of the proposed methods is demonstrated in a computational study with benchmark methods from the literature. It achieved feasible solutions for most of the benchmark test instances (62.5%) considering a diverse subset. The impact of flexibility of resource and due date parameters was evaluated, and resource availability had the largest influence on the objective function.
Publication details
Authors in the community:
José Manuel Leitão da Silva Santos
ist190663
Supervisors of this institution:
Tânia Rodrigues Pereira Ramos
ist46496
Fields of Science and Technology (FOS)
other-engineering-and-technologies - Other engineering and technologies
Publication language (ISO code)
eng - English
Rights type:
Embargo lifted
Date available:
October 19, 2023
Institution name
Instituto Superior Técnico